The third phase of the Onondaga Commons Green Infrastructure project, consisting of a porous asphalt lot at the Rural Metro facility located at 488 W. Onondaga Street, Syracuse, was completed on November 24, 2014. The project was designed to capture runoff from the surrounding asphalt parking lot and the Rural Metro building, estimated at over 1 1/2 million gallons annually. The project was designed by Natural Systems Engineering in partnership with Short Enterprises (Syracuse, New York). Construction was performed by Daly Construction (Sacketts Harbor, New York).
Monthly Archives: November 2014
Leave a reply
Construction underway for JC Smith Green Infrastructure!
Construction began last week on the JC Smith green infrastructure (GI) project located at 338 Peat Street in Syracuse consisting of a porous asphalt lot, and streetside bioretention areas. The porous asphalt lot will manage stormwater that formerly ran off the impervious storage lot, The bioretention areas will manage runoff from Peat Street and the Canal Street Extension. See photos below. The project is funded by Onondaga County’s Save the Rain program and Natural Systems Engineering, worked constructively with the City of Syracuse to address sewer connection issues given the constraints of the County’s award and the owner’s budget for the project. Construction by J & J Landscaping of East Syracuse.