NSE completed the ground loop design for 2-building apartment complex in Albany, New York for the U.W. Marx Construction Company and Regan Development in November 2024. The buildings represent a total design load of almost 100 tons and the ground loop consists of eighteen vertical wells drilled to 620 ft. The design was based on heat loads calculated using Carrier’s Hourly Analysis Program (HAP) and field thermal conductivity testing performed by Earth Energy Connections, Inc. (Hudson, New York).
Drilling of the geothermal wellfield was completed in late 2024 with construction of the apartments to be completed in 2025.