The Erie-Bruce Green Infrastructure project located at 2112 Erie Boulevard East in Syracuse consisted of porous asphalt, porous pavers, and two bioretention areas. The site is characterized by sloping topography toward the office building, and clayey soils exhibiting low infiltration. The green infrastructure installed not only achieved the Onondaga County Save the Rain program objectives for retention of stormwater on-site, but did so in a manner that actually alleviated the flooding that sometimes occurred in the building related to storm runoff. Construction was completed in the Fall of 2013. Photos are from late Summer 2014.