Construction began this month on the “Gar Building” green infrastructure project located at 414-416 W. Onondaga Street, Syracuse. This project involves converting a run down parking lot previously connected to the combined sewer to a porous asphalt installation with ornamental landscaping. Shown below is the stone infiltration basin and the base course of porous asphalt being installed are shown below.
Third Phase of Onondaga Commons Green Infrastructure Begun September 2014!
Leave a reply